TELSTRA

Telstra have ongoing requirements to upgrade and install new systems to maintain and expand their services. These systems include the following:

  • DC Telecommunications power systems (Rectifiers)
  • Chillers and Mechanical equipment.
  • UPS systems
  • Emergency Electrical Generators
  • Technical Earthing systems

We have been involved in the design of these systems in multiple major and minor projects across NSW and ACT.

Our role is to provide complete design of the low voltage systems, and plan the cutover strategy to eliminate outages and risk.

Our process starts with understanding and discussing the requirements of the client, taking the brief, working out what they need, as well as discussing the budget and timeframe.

Trying to obtain the most current engineering drawings and single line diagrams.

We arrange multiple site visits to survey, study and document the current electrical system and determine the site’s capacity to ensure we provide the best solution.

With our design we prioritise redundancy and maintainability of the electrical system.

We base our design of the electrical switchboards on templates that we have developed and updated over the years, and we keep updating them based on new technologies, feedback from manufacturers and previous installations, or new requirements.

We provide and perform the following:

  • CAD drawings of the complete electrical design including floor plans and single line diagrams.
  • As-Built drawings.
  • Electrical specifications.
  • Site inspections and witness tests for switchboards and ATS’s.
  • Inspection reports during and after the completion of works.
  • Review and approve Workshop Drawings.
  • Review and approve Operation & Maintenance manuals.
  • Site surveys and investigations.
  • Electrical power survey including power measurements when possible.
  • BES reports.

Some of the challenges we face:

  • Working in a live environment and making cutovers safely without interruption to service
  • Investigating and integrating into the existing complex power systems.
RECTIFIER POWER PROJECTS

Haymarket TE - Building 2 Level 8 Rectifier Upgrade 2016
Haymarket TE - Building 2 Level 7 Rectifier Upgrade 2017
Haymarket TE - Building 1 Level 1 Rectifier Upgrade 2017
Parramatta TE - Building 3 Level 4 Rectifier Upgrade 2016
Parramatta TE - Building 2 Level 1 Rectifier Upgrade 2017
Parramatta TE - Building 2 Rectifier Power Upgrade 2017
Parramatta TE - Building 3 Level 7 Rectifier Upgrade 2017
Chatswood TE - Level 2 Rectifier Upgrade 2015
Chatswood TE - Building 2 Level 5 Rectifier Upgrade 2017
Chatswood TE - Building 2 Level 2 Power Upgrade 2017
Chatswood TE - Building 2 Level 6 & Power Survey 2017
Chatswood TE - Building 1 Level 3 Rectifier Upgrade 2018
Kent St. TE - Level 10 & Level 11 Rectifier Upgrade 2017
Kent St. TE - Level 5 Rectifier Upgrade 2017
Paddigton TE - Level 5 Rectifier Upgrade 2020

MECHANICAL POWER PROJECTS

Haymarket TE - Level 9 Chiller Upgrade 2015
Haymarket TE - Building 2 Chiller Upgrade 2018
Parramatta TE - Building 2 Mechanical Risers Upgrade 2016
Parramatta TE - Building 3 Level 3 PCU Upgrade 2018
Parramatta TE - Building 3 Level 3 H4 Pod 2021
Chatswood TE - Chiller LCR Upgrade 2017
Chatswood TE - Infrastructure Upgrade Stage 2 2017
Campsie TE - HVAC Upgrade 2019
Austral TE - HVAC Upgrade 2019
Ingleburn TE - HVAC Upgrade 2019
Wetherill Park TE - HVAC Upgrade 2019
Shalvey TE - HVAC Upgrade 2019
Peakhurst TE - HVAC Upgrade 2019

 
UPS PROJECTS

Haymarket TE - Level 11 UPS LCR 2019
Parramatta TE - Building 2 Level 1 H4 Cooling UPS Procurement 2017
Parramatta TE - Building 2 UPS As built 2017
Parramatta TE - Building 3 Level 3 H4 Pod (Chilled Water Pump UPS) 2021
Kent St. TE - Central Chilled Water UPS 2018
Pitt St. TE - Level 12 UPS Upgrade 2015
Pitt St. TE - Level 11 UPS Audit 2016
Pitt St. TE - Level 13 UPS Upgrade 2017
Oxford Falls – 600Kva UPS Equipment Procurement 2015
Oxford Falls - Teleport UPS Upgrade 2017
Oxford Falls - AJC (Australia-Japan Cable) UPS 2020

GENERATOR PROJECTS

Paddington TE - Generator Upgrade 2018
Haymarket TE - Generator Replacement 2016
Haymarket TE - Building 2 Generator Upgrade 2017
Chatswood TE - Infrastructure Upgrade Stage 2 2017
Miranda TE - MSB & Generator Upgrade 2017
Crace TE - MSB & Generator Upgrade 2020
Minto TE - Generator & MSB upgrade 2016
Granville TE - Generator Upgrade 2018
Springwood TE - Generator Upgrade 2018
Oxford Falls - Diesel Fuel Storage Upgrade 2015
Oxford Falls - Generator Controls & Switchboard Upgrade 2015

MSB & ELECTRICAL INFRASTRUCTURE POWER PROJECTS

Paddington TE - Load Survey 2018
Paddington TE - Main Single Line Diagram Upgrade 2021
Parramatta TE - Site Power review 2018
Parramatta TE - Building 2 Upgrade 2020
Chatswood TE - Building 1 Level 2 Lift Demolition 2017
Chatswood TE - Infrastructure Upgrade Stage 2 2017
Miranda TE - MSB & Generator Upgrade 2017
Lane Cove TE - MSB & Generator Upgrade 2021
Campsie TE - Power Upgrade 2015
Miller TE - MSB replacement 2017
Minto TE - Generator & MSB upgrade 2016
Frenchs Forest TE - Substation & MSB Upgrade 2018
Homebush TE - Substation Upgrade 2019
Oxford Falls - Australia-Japan Cable (AJC) Area MSB Replacement 2015
Oxford Falls - SES Area MSB Upgrade 2015

FITOUT PROJECTS

Paddington TE - Level 6 “000” Fitout 2018
Paddington TE - Level 7 Defence Fitout 2019
Haymarket TE - Building 2 Level 8 Fitout 2016
Haymarket TE - Building 1 Level 1 H4 Fitout 2017
Parramatta TE - Building 2 Level 1 Fitout 2017
Parramatta TE - Building 2 Level 1 H4 Fitout 2017
Parramatta TE - Building 1 mmWave Lab Fitout 2021
Chatswood TE - Building 1 Level 2 Fitout 2018
Kent St. TE - Level 11 & Level 5 Fitout 2017
Kent St. TE - Level 12 H4 Fitout 2017
Kent St. TE - Level 12 H3 Fitout 2017